专业信息系统项目管理师网站|培训机构|服务商(2021信息系统项目管理师学习QQ群:89253946,客服QQ:800184589)

软题库 培训课程
当前位置:信管网 >> 信息系统项目管理师 >> 综合知识 >> 文章内容
信息系统项目管理师英语复习资料:历年英语真题试题与答案
来源:信管网 2012年03月13日 【所有评论 分享到微信

下载完整PDF文档:信息系统项目管理师英语复习资料:历年英语真题试题与答案

2005年上半年
● (66)is a method of constructing a project schedule network diagram that uses boxes or rectangles ,referred to as nodes, to represent activites and connects them with arrows that as ow the dependencies. This method includes following types of dependcies orprecedence relationships:(67)the initiation of the successor activity, depends upon the completion of the predecessor activity
(68)the initiation of the successor activity,depends upon the initiation of the predecessor activity
(66) A.PDM       B.CPM      C.PERT      D.AOA
(67) A.F-S       B.F-F      C.S-F       D.S-S 
(68) A.F-S       B.F-F      C.S-F       D.S-S

● estimating schedule activity costs involves developing an(69)of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives. for example, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations. the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estmates are generally expressed in units of(70)to facilitate comparisons both within and across projects. the(71)describes important information about prject requirement that is considered duing cost estimating.
(69)  A.accuracy  B.approxination  C.specification  D.summary
(70)  A.activity  B.work       C.currency     D.time
(71)  A.project scope statement     B.statement of work
   C.project management plan     D.project policy

● The (72)technique involves using projecet characteristics in a mathematical model to predict total project cost.models can be simple or complex.
(72) A.cost aggregation         B.reserve analysis
  C.parametric estimating       D.funding limit reconciliarion

● (73)is a measurable, verifiable work product such as specification. feasibility study report, detail document, or working prototype
(73) A.milestone    B.deliverable    C.etc     D.BAC

● (74)are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.
(74) A.controls           B.baselines
   C.project stakeholders     D.project managers

● (75)is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
(75) A.project acceptance        B.scope verification
   C.scope definition         D.WBS Creation

2005年下半年
● __(66)__ means that every project has a definite beginning and a definite end.
(66)A. Project phase    B. Unique    C. Temporary    D. Closure

● The __(67)__ defines the phases that connect the beginning of a project to its end.
(67)A. schedule    B. project life cycle    C. temporary    D. milestone

● __(68)__ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.
(68)A. Project managers        B. Project team members
   C. Sponsors            D. Project stakeholders

● The __(69)__ Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements.
(69)A. Planning                B. Executing?? ???????????
   C. Monitoring and Controlling       D. Closing

● The __(70)__ provides the project manager with the authority to apply organizational resources to project activities.
(70)A. project management plan        B. contract
   C. project human resource plan       D. project charter

● The __(71)__ describes, in detail, the project’s deliverables and the work required to create those deliverables.
(71)A. project scope statement        B. project requirement
    C. project charter            D. product specification

● The process of __(72)__ schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.
(72)A. estimating    B. defining    C. planning    D. sequencing

● PDM includes four types of dependencies or precedence relationships:
...
__(73)__. The completion of the successor activity depends upon the initiation of the predecessor activity.
(73)A. Finish-to-Start       B. Finish-to-Finish
   C. Start-to-Start        D. Start-to-Finish

● __(74)__ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.
(74)A. Planned value      B. Earned value
   C. Actual cost       D. Cost variance

● __(75)__ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure performance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area.
(75)A. Metrics    B. Measurement    C. Benchmarking    D. Baseline 

答案:
2005年上半年:(66) A (67) A (68) D (69) B (70) C(71) A (72) C (73) B (74) C (75) B
2005年下半年:(66) C (67) B (68) D (69) B (70) D (71) A (72)A (73) D (74) B(75)C 

 

[1]   [2]   [3]   [4]   [5]   
扫码关注公众号

温馨提示:因考试政策、内容不断变化与调整,信管网网站提供的以上信息仅供参考,如有异议,请以权威部门公布的内容为准!

信管网致力于为广大信管从业人员、爱好者、大学生提供专业、高质量的课程和服务,解决其考试证书、技能提升和就业的需求。

信管网软考课程由信管网依托10年专业软考教研倾力打造,官方教材参编作者和资深讲师坐镇,通过深研历年考试出题规律与考试大纲,深挖核心知识与高频考点,为学员考试保驾护航。面授、直播&录播,多种班型灵活学习,满足不同学员考证需求,降低课程学习难度,使学习效果事半功倍。

相关内容

发表评论  查看完整评论  

推荐文章