软题库 移动APP 扫码下载APP 随时随地移动学习 培训课程
当前位置:信管网 >> 在线考试中心 >> 信息系统项目管理师题库 >> 试题查看
试卷名称 2004年上半年系统分析师考试上午真题试题(综合知识)
考试中心《2004年上半年系统分析师考试上午真题试题(综合知识)》在线考试
试卷年份2004年上半年
试题题型【单选题】
试题内容

Developing reliable software on time and within (1) represents a difficult endeavor for many organizations.
Usually business solutions have three main aspects : people, (2), and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process (3). Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the Chaos.CASE tools are not enough. "A fool with a tool is still a fool!"
Structured method was the first wave of the software industry. This was the beginning of transforming software development from a "(4) industry" to mass production. Software process movement is the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry: "software industrialization".
Software development will become like an assembly and manufacturing process. A critical enabling factor is a disciplined software engineering process with predictable quality, (5) and functionality.
(1)A、forecast
B、preparation
C、budget
D、economy
(2)A、process
B、skill
C、organization
D、interface
(3)A、law
B、discipline
C、plan
D、evaluation
(4)A、College
B、family
C、workshop
D、Cottage
(5)A、plan
B、schedule
C、effort
D、product


相关试题

推荐文章
合作网站内容