2013下半年信息系统项目管理师最后5道英文题解析
来源:信管网 2014年03月18日 【所有评论 分享到微信

2013年下半年软考高级信息系统项目管理师综合知识真题答案与解析:

71、Each machine in the internet is assigned a unique network address,called(),that is used to identify the machine for communication purposes
A、MAC address
B、IP address
C、host address
D、domain name address
信管网解析:
在互联网上的每个机器都被分配了一个IP地址,这个地址是用来和其他机器通信的。
信管网参考答案:B

72、Information,in its most restricted technical sense,is a seque of symbols that can be interpreted as a message.ingormation can be recorded as signs,or transmitted as()
A、symbols
B、message
C、signals
D、wave
信管网解析:
信息是用来代表消息的,可以被标记,或者是以信号的方式传输
信管网参考答案:C

73、The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in ()
A、possibility
B、bits
C、bps
D、probability
信管网解析:
一个事件的不确定性的测量是通过其发生的概率是成反比的。是更加不确定事件。需要更多的信息来解决该事件的不确定性。以比特的信息量。
信管网参考答案:B

74、A()is a type of bar chart that illustrates a project schedule. It illustrates the start and finish dates of the terminal elements and summary elements of a project.
A、gantt chart
B、project histogram
C、milestone chart
D、project flowchart
信管网解析:
A是甘特图,B是项目直方图,C是里程碑图,D是项目流程图
信管网参考答案:A

75、The intention of the()is to schedule, organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.
A、project work breakdown
B、project security authentication
C、project management
D、project flowchart
信管网解析:
项目管理的目的就是计划,组织和控制项目的活动来达到最终的目的。
信管网参考答案:C

扫码关注公众号

温馨提示:因考试政策、内容不断变化与调整,信管网网站提供的以上信息仅供参考,如有异议,请以权威部门公布的内容为准!

信管网致力于为广大信管从业人员、爱好者、大学生提供专业、高质量的课程和服务,解决其考试证书、技能提升和就业的需求。

信管网软考课程由信管网依托10年专业软考教研倾力打造,官方教材参编作者和资深讲师坐镇,通过深研历年考试出题规律与考试大纲,深挖核心知识与高频考点,为学员考试保驾护航。面授、直播&录播,多种班型灵活学习,满足不同学员考证需求,降低课程学习难度,使学习效果事半功倍。

相关内容

发表评论  查看完整评论  

推荐文章