软题库 移动APP 扫码下载APP 随时随地移动学习 培训课程
当前位置:信管网 >> 在线考试中心 >> 信息系统项目管理师题库 >> 试题查看
试卷名称 2009年上半年系统分析师考试上午真题试题(综合知识)
考试中心《2009年上半年系统分析师考试上午真题试题(综合知识)》在线考试
试卷年份2009年上半年
试题题型【单选题】
试题内容

 Many of the activities performed during the preliminary investigation are still beingconducted in  (1) , but in much greater depth than before. During this phase, the analystmust become fully aware of the  (2)  and must develop enough knowledge about the(3)  and the existing systems to enable an effective solution to be proposed andimplemented. Besides the  (4)  for process and data of current system, the deliverablefrom this phase also includes the  (5)  for the proposed system.
(1)A、analysis phase 
B、design phase 
C、implementation phase 
D、maintenance phase
(2)A、main symptom 
B、root problem 
C、final blueprint 
D、data specification
(3)A、hardware environment 
B、testing environment 
C、software environment 
D、business environment
(4)A、logical models 
B、physical models 
C、design models 
D、implementation models
(5)A、hardware and software specification 
B、system performance specification 
C、formal requirements definition 
D、general problem statement 


相关试题

推荐文章
合作网站内容