试卷年份2014年上半年
试题题型【单选题】
试题内容

    Information systems planners in accordance with the specific information system planning methods developed information architecture.Information Engineering follow(1 )approach,in which specific information systems from a wide range of information needs in the understanding derived from(for example,we need about customers,products,suppliers,sales and processing of the data center),rather than merging many detailed information requested(orders such as a screen or in accordance with the importation of geographical sales summary report).Top-down planning will enable developers(2 )information system,consider system components provide an integrated approach to  enhance the information system and the relationship between the business objectives of the understanding,deepen their understanding of information systems throughout the organization in understanding the impact.
Information Engineering includes four steps:(3 ),( 4),design and implementation. The planning stage of project information generated inforamtion system architecture,(5 )enterprise data model.
(1 )A.Down-top planning
B.sequence planning
C.Top-down planning
D.parallel planning
(2)A.to plan more comprehensive
B.to study more comprehensive
C.to analysis more comprehensive
D.to plan more unilateral
(3)A.studying
B.planning
C.researching
D.considering
(4 )A.consider
B.study
C.plan
D.analysis
(5 )A.including
B.excepting
C.include
D.except

查看答案

相关试题

61题: 系统响应时间是衡量计算机系统负载和工作能力的常用指标。小赵在某台计算机上安装了一套三维图形扫描系统,假设小赵用三维图扫描系统完成一项扫描任务所占 用的计算机运行时间Tuser=100s;而启动三维图形扫描系统需要运行时间Tsys=30s,那么该系统对小赵这次扫描任务的响应时间应该是( )
A.100s
B.30s
C.130s
D.70s
答案解析与讨论:www.cnitpm.com/st/3118813447.html

62题: 信息系统建成后,根据信息系统的特点、系统评价的要求与具体评价指标体系的构成原则,可以从三个方面对信息系统进行评价,这些评价一般不包括( )
A.技术性能评价
B.管理效益评价
C.经济效益评价
D.社会效益评价答案解析与讨论:www.cnitpm.com/st/3118916659.html

63题: 企业信息化建设需要大量的资金投入,成本支出项目多且数额大。在企业信息化建设成本支出项目中,系统切换费用属于( )
A.设备购置费用
B.设施费用
C.开发费用
D.系统运行维护费用
答案解析与讨论:www.cnitpm.com/st/3119024519.html