The reason for establishing a stop or freezing point on the design of a new system is to:
A、prevent further changes to a project in process.
B、indicate the point at which the design is to be completed.
C、require that changes after that point be evaluated for cost-effectiveness.
D、provide the project management team with more control over the project design.