监理单位在项目组织协调过程中,有关会议的描述错误的是()
A、监理例会由总监理工程师组织与主持
B、监理专题会议可由总监理工程师授权的监理工程师主持
C、监理专题会议的会议纪要可由总监理工程师授权的监理工程师签认
D、应该在会后 24 小时内公布会议成果
The stages within the developement phase of the software life cycle are ( ).
A、design,analysis,implementation,and testing
B、analysis,design,implementation,and testing
C、analysis,design,testing,and implementation
D、design,analysis,testing,and implementation
which type of the backup process backs up files that have been modified since the last time all data was backed up?( )
A、Incremental backup
B、Full backup
C、Partial backup
D、Differential backup
”Cost of quality ” is a project management concept that includes cost of ( ).
A、exceedings requirements
B、Changed to the requirements
C、Ensuring conformance to requirements
D、The quality control requirements