试卷年份2020年下半年
试题题型【单选题】
试题内容

The Address Resolution Protocol(ARP)was developed to enable communication on an internetwork and perform a required function in IP routing.ARP lies between layers(  )of the OSI model,and allows computers to introduce each other across a network prior to communication.APR finds the(  )address of a host from its known(  )address.Before a device sends a datagram to another device,it looks in its ARP cache to see if there is a MAC address and corresponding IP address for the destination device.If there is no entry,the source device sends a(  )message to every device on the network.Each device compares the IP address to its own.Only the device with the matching IP address replies with a packet containing the MAC address for the device(except in the case of “proxy ARP”).The source device adds the(  )device MAC address to its ARP table for future reference.
1)A.1And 2
B.2And 3
C.3And 4
D.4And 5
2)A.IP
B.logical
C.hardware
D.network
3)A.IP
B.physical
C.MAC
D.virtual
4)A.unicast
B.multicast
C.broadcast
D.point-to-point
5)A.source
B.destination
C.gateway
D.proxy

查看答案

相关试题

62题: 对某银行业务系统的网络方案设计时,应该优先考虑(  ) 原则。
A.开放性
B.先进性
C.经济性
D.高可用性
答案解析与讨论:www.cnitpm.com/st/4501411175.html

63题: 在项目管理过程中,变更总是不可避免,作为项目经理应该让项目干系人认识到(  )。
A.在项目设计阶段,变更成本较低
B.在项目实施阶段,变更成本较低
C.项目变更应该由项目经理批准
D.应尽量满足建设方要求,不需要进行变更控制

答案解析与讨论:www.cnitpm.com/st/450153690.html

64题: 进行项目风险评估最关键的时间点是(  )。
A.计划阶段
B.计划发布后
C.设计阶段
D.项目出现问题时
答案解析与讨论:www.cnitpm.com/st/4501625090.html