专业信息系统项目管理师网站|培训机构|服务商(2021信息系统项目管理师学习QQ群:89253946,客服QQ:800184589)

软题库 培训课程
当前位置:信管网 >> 信息系统项目管理师 >> 考试资讯 >> 文章内容
信息系统项目管理师考试英语练习题(十四)
来源:信管网 2020年05月15日 【所有评论 分享到微信

2009年上半年信息系统项目管理师考试英语真题

Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the( ) and must develop enough knowledge about the( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the( ) for process and data of current system, the deliverable from this phase also includes the( ) for the proposed system.

( )A. analysis phase                   B.  design phase  

C.  implementation phase           D. maintenance phase

( )A. main symptom                   B.  root problem

C.  final blueprint                  D.  data specification

( )A. hardware environment            B. testing environment

C. software environment             D. business environment

( )A. logical models                   B. physical models

C. design models                   D. implementation models

( )A. hardware and software specification    B. system performance specification

C. formal requirements definition        D. general problem statement

信管网解析:

初步调研阶段的许多活动在分析阶段仍然要做,但是会比以前更深入地做。在分析阶段,分析师一定要完全清楚最终蓝图并且开发出充分的关于业务环境知识和目前系统的知识以使一个有效的解决方案被提交和实施。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。

信管网参考答案: A,   B,   D,   A,   C

扫码关注公众号

温馨提示:因考试政策、内容不断变化与调整,信管网网站提供的以上信息仅供参考,如有异议,请以权威部门公布的内容为准!

信管网致力于为广大信管从业人员、爱好者、大学生提供专业、高质量的课程和服务,解决其考试证书、技能提升和就业的需求。

信管网软考课程由信管网依托10年专业软考教研倾力打造,官方教材参编作者和资深讲师坐镇,通过深研历年考试出题规律与考试大纲,深挖核心知识与高频考点,为学员考试保驾护航。面授、直播&录播,多种班型灵活学习,满足不同学员考证需求,降低课程学习难度,使学习效果事半功倍。

相关内容

发表评论  查看完整评论  

推荐文章